9,611 properties to rent in District I Quezon City

Condo · for rent
₱ 26,000
Studio Condo Unit with Balcony For Rent at Vertis North Estate Avida Sola 2 Quezon City
District I Quezon City
· 1 Bath · Condo
· Air conditioning · Balcony · Integral kitchen · Internet · Concierge · Security · Swimming pool · Gym · Built-in wardrobe · 24 hours security · Fire alarm · Smoke detector
District I Quezon City · 1 Bath · Condo · Air conditioning · Balcony · Integral kitchen · Internet · Concierge · Security · Swimming pool · Gym · Built-in wardrobe · 24 hours security · Fire alarm · Smoke detector
Floor Area : 26 square meters Studio Unit with Balcony Monthly Rate : Philippine Pesos 26,000.00 Minimum Lease Term : 1 year Advance Rental of 1 month Security Deposit of 2 months Condition : NEW UNIT AND PARTLY FURNISHED INCLUSIONS : - Fully Automatic Inverter Washing Machine and Dryer - Inverter Aircon - Inverter Upright Refrigerator and Freezer - Full Length Bunk Beds for 2 persons: with 36" width by 79" length mattresses and with provisions for reading lights and electrical outlets per bunk - Extensive kitchen countertop and cabinets with provision for microwave and oven toaster - Elba Rangehood Exhaust System Installed - Wide wardrobe Cabinets for 2 persons with individual locks - Work/Dining Table for 2 persons with provision for computer and printer equipment - Shoe and Ironing Board Cabinet installed along entrance way - Shower Water Heater BUILDING FACILITY AND AMENITIES INCLUDE: Concierge Mail box 24 hour security service Swimming Pool Basketball Court Parking not included.
Floor Area : 26 square meters Studio Unit with Balcony Monthly Rate : Philippine Pesos 26,000.00 Minimum Lease Term : 1 year Advance Rental of 1 month Security Deposit of 2 months Condition : NEW UNIT AND PARTLY FURNISHED INCLUSIONS : - Fully Automatic Inverter Washing Machine and Dryer - Inverter Aircon - Inverter Upright Refrigerator and Freezer - Full Length Bunk Beds for 2 persons: with 36" width by 79" length mattresses and with provisions for reading lights and electrical outlets per bunk - Extensive kitchen countertop and cabinets with provision for microwave and oven toaster - Elba Rangehood Exhaust System Installed - Wide wardrobe Cabinets for 2 persons with individual locks - Work/Dining Table for 2 persons with provision for computer and printer equipment - Shoe and Ironing Board Cabinet installed along entrance way - Shower Water Heater BUILDING FACILITY AND AMENITIES INCLUDE: Concierge Mail box 24 hour security service Swimming Pool Basketball Court Parking not included.
₱ 26,000
Condo · for rent
₱ 26,000
Vertis North Avida Sola 2 Furnished Studio Unit with Balcony For Rent
District I Quezon City
· 1 Bath · Condo
· Air conditioning · Balcony · Built-in wardrobe · Internet · Concierge · Security · Swimming pool · Gym · 24 hours security · Fire alarm · Smoke detector
District I Quezon City · 1 Bath · Condo · Air conditioning · Balcony · Built-in wardrobe · Internet · Concierge · Security · Swimming pool · Gym · 24 hours security · Fire alarm · Smoke detector
Floor Area : 26 square meters Studio Unit with Balcony Monthly Rate : Philippine Pesos 26,000.00 Minimum Lease Term : 1 year Advance Monthly Rental of 1 month Security Deposit of 2 months Condition : NEW, PARTLY FURNISHED INCLUSIONS : - Fully Automatic Inveter Washing Machine and Dryer - Inverter Aircon - Inverter Upright Refrigerator and Freezer - Full Length Bunk Beds for 2 persons with 36" width by 79" length mattresses with provision for reading lights and electrical outlet per bunk bed - Extensive kitchen countertop and cabinets with provision for microwave oven and oven toaster - Elba Rangehood Exhaust System Installed - Wide wardrobe Cabinets for 2 persons with individual locks - Work/Dining table for 2 persons with provision for computer and printer equipment - Shoe and Ironing Board Cabinet installed along entrance way - Shower Water Heater BUILDING FACILITY: Concierge Mail box 24 hour security service Swimming Pool Basketball Court Parking not included.
Floor Area : 26 square meters Studio Unit with Balcony Monthly Rate : Philippine Pesos 26,000.00 Minimum Lease Term : 1 year Advance Monthly Rental of 1 month Security Deposit of 2 months Condition : NEW, PARTLY FURNISHED INCLUSIONS : - Fully Automatic Inveter Washing Machine and Dryer - Inverter Aircon - Inverter Upright Refrigerator and Freezer - Full Length Bunk Beds for 2 persons with 36" width by 79" length mattresses with provision for reading lights and electrical outlet per bunk bed - Extensive kitchen countertop and cabinets with provision for microwave oven and oven toaster - Elba Rangehood Exhaust System Installed - Wide wardrobe Cabinets for 2 persons with individual locks - Work/Dining table for 2 persons with provision for computer and printer equipment - Shoe and Ironing Board Cabinet installed along entrance way - Shower Water Heater BUILDING FACILITY: Concierge Mail box 24 hour security service Swimming Pool Basketball Court Parking not included.
₱ 26,000
Condo · for rent
₱ 75,000
FOR LEASE | Elegant 2BR + Maid’s Room with Parking at High Park Vertis North by Alveo
District I Quezon City
· 89 m² · 2 Bedrooms · 3 Baths · Condo
· 24 hours security · Air conditioning · Alarm · Balcony · Built-in wardrobe · Parking · Cctv · Cellar · Children area · Laundry room · Concierge · Access for people with disabilities · Electricity · Ensuite · Equipped kitchen · Fire alarm · Fire exits · Fireplace · Garden · Green area · Grill · Guardhouse · Gym · Heating · Integral kitchen · Internet · Jacuzzi · Library · Multipurpose room · Lift · Natural gas · Office room · Panoramic view · Roof garden · Sauna · Security · Service room · Smoke detector · Swimming pool · Tennis court · Terrace · Video cable · Water tank · Water · Wifi · Patio
District I Quezon City · 89 m² · 2 Bedrooms · 3 Baths · Condo · 24 hours security · Air conditioning · Alarm · Balcony · Built-in wardrobe · Parking · Cctv · Cellar · Children area · Laundry room · Concierge · Access for people with disabilities · Electricity · Ensuite · Equipped kitchen · Fire alarm · Fire exits · Fireplace · Garden · Green area · Grill · Guardhouse · Gym · Heating · Integral kitchen · Internet · Jacuzzi · Library · Multipurpose room · Lift · Natural gas · Office room · Panoramic view · Roof garden · Sauna · Security · Service room · Smoke detector · Swimming pool · Tennis court · Terrace · Video cable · Water tank · Water · Wifi · Patio
🏙️ FOR LEASE | Elegant 2BR + Maid’s Room with Parking at High Park Vertis North by Alveo ✨ Experience elevated Ayala living in the heart of Quezon City. Step into sophistication with this beautifully designed 2-Bedroom residence at High Park Vertis North, featuring elegant interiors, generous living spaces, and the comfort of a dedicated maid’s quarters. Perfect for executives, professionals, expatriates, and families seeking a premium urban lifestyle. 📍 High Park Vertis North by Alveo Land, Quezon City 🏡 Property Details: ✔️ 2 Bedrooms ✔️ 3 Toilets & Baths ✔️ Maid’s Room with own T&B ✔️ 89 sqm Floor Area ✔️ Semi-Furnished ✔️ Elegant Interior Design ✔️ 1 Parking Slot Included ✔️ Spacious Living and Dining Area 🌟 Why You’ll Love This Home: ✓ Elegant and move-in ready interiors ✓ Bright, spacious, and functional layout ✓ Resort-inspired amenities exclusive to residents ✓ Walking distance to Ayala Malls Vertis North and TriNoma ✓ Convenient access to MRT, major roads, and business districts ✓ Enjoy the prestige and security of an Alveo community 💰 Monthly Rent: ₱75,000 This premium residence offers the perfect blend of comfort, convenience, and prestige—ideal for those who desire a refined city lifestyle without compromise. 📩 Schedule your private viewing today. Premium units in High Park Vertis North are highly sought after and rarely stay available for long. Send us a message with the following details: ✅ Full Name ✅ Nationality ✅ Company/Occupation ✅ Preferred Move-in Date ✅ Budget Range #HighParkVertisNorth #AlveoLand #VertisNorth #CondoForLease #QuezonCityCondo #LuxuryLiving #AyalaProperty #QCCondoForRent #CondoForRentPH #ExpatHousing #PremiumLiving #QuezonCityRental
🏙️ FOR LEASE | Elegant 2BR + Maid’s Room with Parking at High Park Vertis North by Alveo ✨ Experience elevated Ayala living in the heart of Quezon City. Step into sophistication with this beautifully designed 2-Bedroom residence at High Park Vertis North, featuring elegant interiors, generous living spaces, and the comfort of a dedicated maid’s quarters. Perfect for executives, professionals, expatriates, and families seeking a premium urban lifestyle. 📍 High Park Vertis North by Alveo Land, Quezon City 🏡 Property Details: ✔️ 2 Bedrooms ✔️ 3 Toilets & Baths ✔️ Maid’s Room with own T&B ✔️ 89 sqm Floor Area ✔️ Semi-Furnished ✔️ Elegant Interior Design ✔️ 1 Parking Slot Included ✔️ Spacious Living and Dining Area 🌟 Why You’ll Love This Home: ✓ Elegant and move-in ready interiors ✓ Bright, spacious, and functional layout ✓ Resort-inspired amenities exclusive to residents ✓ Walking distance to Ayala Malls Vertis North and TriNoma ✓ Convenient access to MRT, major roads, and business districts ✓ Enjoy the prestige and security of an Alveo community 💰 Monthly Rent: ₱75,000 This premium residence offers the perfect blend of comfort, convenience, and prestige—ideal for those who desire a refined city lifestyle without compromise. 📩 Schedule your private viewing today. Premium units in High Park Vertis North are highly sought after and rarely stay available for long. Send us a message with the following details: ✅ Full Name ✅ Nationality ✅ Company/Occupation ✅ Preferred Move-in Date ✅ Budget Range #HighParkVertisNorth #AlveoLand #VertisNorth #CondoForLease #QuezonCityCondo #LuxuryLiving #AyalaProperty #QCCondoForRent #CondoForRentPH #ExpatHousing #PremiumLiving #QuezonCityRental
₱ 75,000
Condo · for rent
₱ 30,000
Studio Unit For Rent - High Park Vertis
District I Quezon City
· 1 Bath · Condo
· Parking · Security · Swimming pool
District I Quezon City · 1 Bath · Condo · Parking · Security · Swimming pool
🔆 Studio Unit For Rent - High Park Vertis 📌Property Details Tower 1 37th Floor Studio 1TB 32 sqm Fully Furnished No Parking Slot 🏷 Asking Price: ₱ 30,000 👩‍💼 Veronica Ginez | @vsg.realestate 📞 Call: ‪+63 917 650 ----‬ 🤳 Whatsapp/Viber/Telegram: ‪+63 917 650 ----‬ ----- 🔍 Looking for other properties? Visit: http://carousell.ph/u/vsg.realesta---- #VSGrealestate #VSGproperties #LuxuryHome #HighParkVertisNorth #LuxuryRealEstate #RealEstateBrokeragePH #CondoForRent #PropertiesForRentPH
🔆 Studio Unit For Rent - High Park Vertis 📌Property Details Tower 1 37th Floor Studio 1TB 32 sqm Fully Furnished No Parking Slot 🏷 Asking Price: ₱ 30,000 👩‍💼 Veronica Ginez | @vsg.realestate 📞 Call: ‪+63 917 650 ----‬ 🤳 Whatsapp/Viber/Telegram: ‪+63 917 650 ----‬ ----- 🔍 Looking for other properties? Visit: http://carousell.ph/u/vsg.realesta---- #VSGrealestate #VSGproperties #LuxuryHome #HighParkVertisNorth #LuxuryRealEstate #RealEstateBrokeragePH #CondoForRent #PropertiesForRentPH
₱ 30,000
Shore Residences
From ₱ 40,000
1-2
Bedrooms
·
1-2
Baths
I. About Shore Residences We offer a selection of 1-bedroom to 2-bedroom units, ranging from bare to fully furnished, ideal for young professionals, couples, small families, and expats. II. Shore Residences Features and Amenities Shore Residences is packed with amenities to match its coastal vibe. Enjoy adult and kiddie swimming pools, lush garden spaces, jogging trails, and a children’s playground. Relax in lounge areas, function rooms, grand lobbies, or a commercial strip offering daily conveniences. Fitness enthusiasts will appreciate the gym and outdoor activity zones. The development is equipped with elevators, centralized water systems, water tanks, 24/7 security, CCTV surveillance, automatic FDAS fire-alarm systems, standby generators, and on-site parking. III. Why Shore Residences Is a Perfect Condominium Option Shore Residences perfectly balances city access with relaxed bayfront living. Units can be rented bare, semi-finished, or fully furnished, allowing tenants to personalize their space. The scenic bay area, wellness amenities, and safe environment create a perfect match for those seeking a quality lifestyle. Its proximity to offices, malls, entertainment venues, and transport links makes it an ideal refuge for those wanting both productivity and peace. IV. Shore Residences Location Located at Seaside Blvd. corner Sunrise Drive in the Mall of Asia Complex, Shore Residences offers front-row access to Manila Bay’s famed sunset views. Nearby landmarks include SM Mall of Asia, the Entertainment City zone, and cultural venues. Its position near Macapagal and Roxas Boulevards ensures seamless links to Roxas Boulevard, NAIA terminals, and key commercial districts across Metro Manila. V. How to Get to Shore Residences Take MRT to Taft Avenue Station, then hop on a jeepney bound for SM MOA—Shore is a 10–15 minute walk along Seaside Blvd. Alternatively, ride LRT-1 to Libertad Station and transfer via jeepney or walk. Baclaran jeepneys also serve the area. Driving guests can take Macapagal or Roxas Blvd., turn onto Sunrise Drive, then Seaside Blvd. Shore offers parking (with overnight rates around PHP400), and SM MOA adds additional parking. The pedestrian route from One E-Com Center is safe and well-lit. VI. What are the Condominium Units in Shore Residences Available units for rent include 1‑Bedroom and 2‑Bedroom layouts. Each unit is offered in bare, semi‑finished, or fully finished conditions. Units come with air conditioning and fire alarm systems, and select units boast stunning bay or city views. The layouts are thoughtfully designed to optimize space and natural light, suitable for solo professionals, couples, or families. VII. Financing Options Renters may reserve a unit online. The reservation fee is equivalent to one month’s rent, payable via direct bank deposit. Contact us to schedule a viewing, reserve a unit, or inquire about availability and payment terms. No. of Buildings: 4 Turnover Date: 2017/10; 2019/03
Published by SMDC Good Stays
View project details
Blue Residences
From ₱ 26,000
1
Bedroom
·
1
Bath
I. About Blue Residences Blue Residences is a condominium development located along Katipunan Avenue corner Aurora Boulevard in Loyola Heights, Quezon City. Developed to cater to students and young professionals, it offers a modern and convenient living space within one of the city’s most vibrant academic hubs. Available for rent, this property is ideal for those seeking comfort, accessibility, and a secure environment close to major schools and commercial establishments. II. Blue Residences features and amenities Residents can enjoy a range of lifestyle amenities designed for relaxation and productivity. These include an adult pool, kiddie pool, lobby, amenity lounge, roof deck lounge, function room, and a children’s play area. The development is supported by 24-hour security, CCTV monitoring in selected areas, a front desk, and professional property management services, ensuring a safe and well-maintained community. III. Why Blue Residences Is a Perfect Condominium Option Blue Residences stands out as a practical choice for students and renters due to its strategic location beside Ateneo de Manila University and near other top schools. Its well-planned amenities provide a balance between study and leisure, while the secure environment offers peace of mind for residents and their families. The availability of flexible unit options also makes it suitable for individuals, couples, or small families. IV. Blue Residences Location Situated in Loyola Heights, Quezon City, Blue Residences enjoys a prime location along Katipunan Avenue, a major thoroughfare known for its accessibility to universities, retail hubs, dining spots, and transport links. It is near Ateneo de Manila University, Miriam College, and just a short ride away from UP Diliman. V. How to Get to Blue Residences Blue Residences is easily accessible via major roads and public transportation. It is located directly along Katipunan Avenue corner Aurora Boulevard, making it convenient for commuters coming from different parts of Metro Manila. Its proximity to key educational institutions makes daily travel quick and efficient. VI. What are the Condominium Units in Blue Residences The development features a single building offering studio, one-bedroom, and two-bedroom units. Some units can be combined to create larger living spaces, ideal for growing families or couples planning for the future. Units are designed to maximize space, functionality, and comfort. VII. Financing Options As a rental property, Blue Residences typically offers flexible leasing arrangements depending on the unit owner. Standard terms may include advance rental payments and security deposits, allowing tenants to choose options that suit their financial capacity and lifestyle needs.
Published by SMDC Good Stays
View project details
Condo · for rent
₱ 18,000
STUDIO UNIT IN AVIDA TOWER 1 SOLA
District I Quezon City
· 22 m² · 1 Bedroom · 1 Bath · Condo
· 24 hours security · Access for people with disabilities · Air conditioning · Balcony · Cctv · Children area · Lift · Equipped kitchen · Fire alarm · Garden · Gym · Heating · Multipurpose room · Smoke detector · Swimming pool
District I Quezon City · 22 m² · 1 Bedroom · 1 Bath · Condo · 24 hours security · Access for people with disabilities · Air conditioning · Balcony · Cctv · Children area · Lift · Equipped kitchen · Fire alarm · Garden · Gym · Heating · Multipurpose room · Smoke detector · Swimming pool
NEW STUDIO UNIT, CLEAN AND QUIET UNIT LOCATED ON THE 9TH FLOOR, TOWER 1 -AVIDA SOLA. MONTHLY RENT- 18,000 (EXCLUDING WATER, ELECTRICITY) MAX -2 PERSONS NO PETS ALLOWED IN THE WHOLE BUILDING 2 MONTHS SECURITY DEPOSIT (CASH BASIS) 1 MONTH ADVANCE DEPOSIT (CASH BASIS) TERM: 1 YEAR COVERED BY 11 PDCs FURNITURES AND APPLIANCES WERE AVAILABLE (INCLUDING SHOWER HEATER) OTHER AMENITIES WERE AVAILABLE ON THE BUILDING
NEW STUDIO UNIT, CLEAN AND QUIET UNIT LOCATED ON THE 9TH FLOOR, TOWER 1 -AVIDA SOLA. MONTHLY RENT- 18,000 (EXCLUDING WATER, ELECTRICITY) MAX -2 PERSONS NO PETS ALLOWED IN THE WHOLE BUILDING 2 MONTHS SECURITY DEPOSIT (CASH BASIS) 1 MONTH ADVANCE DEPOSIT (CASH BASIS) TERM: 1 YEAR COVERED BY 11 PDCs FURNITURES AND APPLIANCES WERE AVAILABLE (INCLUDING SHOWER HEATER) OTHER AMENITIES WERE AVAILABLE ON THE BUILDING
₱ 18,000
Condo · for rent
₱ 20,000
Condo for Rent in Bagong Pag-asa, Quezon City
District I Quezon City
· 36 m² · 1 Bedroom · 1 Bath · Condo
· 24 hours security · Air conditioning · Integral kitchen · Cctv · Concierge · Lift · Fire alarm · Fire exits · Green area · Gym · Multipurpose room · Security · Smoke detector · Swimming pool
District I Quezon City · 36 m² · 1 Bedroom · 1 Bath · Condo · 24 hours security · Air conditioning · Integral kitchen · Cctv · Concierge · Lift · Fire alarm · Fire exits · Green area · Gym · Multipurpose room · Security · Smoke detector · Swimming pool
Price negotiable. Minimum term is 1 year. The following appliances are already included: - Microwave - 55' Flat screen SMART TV Can add upon request, subject to price negotiation: - Washer/drier - aircon - refrigerator
Price negotiable. Minimum term is 1 year. The following appliances are already included: - Microwave - 55' Flat screen SMART TV Can add upon request, subject to price negotiation: - Washer/drier - aircon - refrigerator
₱ 20,000
Studio · for rent
₱ 20,000
VIVALDI RESIDENCES (Quezon City): FULLY FURNISHED STUDIO UNIT
District I Quezon City
· 25 m² · 1 Bedroom · 1 Bath · Studio
· Alarm · Balcony · Parking · Cctv · Concierge · Fire exits · Fire sprinkler system · Function area · Gym · Lift · Multipurpose room · Swimming pool · 24 hours security · Garden · Security
District I Quezon City · 25 m² · 1 Bedroom · 1 Bath · Studio · Alarm · Balcony · Parking · Cctv · Concierge · Fire exits · Fire sprinkler system · Function area · Gym · Lift · Multipurpose room · Swimming pool · 24 hours security · Garden · Security
This is a magnificent 40-story mixed-use residential condominium tower that is nestled at the very heart of the Quezon City in the Cubao area. The development, which is located at the corner of Aurora Boulevard and EDSA is the first to receive a Green Building Certificate from the local authorities and the first to have cantilevered pool at the top floor. This towering development was designed and constructed by one of the Philippines most renowned development and real estate agency, Euro Towers International Corporation. They have a brilliant portfolio that ranges from residential, commercial and industrial buildings with Vivaldi Residences Cubao being their first high-rise development in the real estate rankings. The company has lived up to its billing through creating a very solid and trustable image built on professionalism and high-quality standards in terms of service delivery and their overall project development. Other developments that the company has delivered include the Vivaldi Residences Davao and the Milan Residences Fairview in Quezon City. Vivaldi Residences Cubao is definitely a good mix of great designs both interior and exterior wise which brings out a very glamorous and stylish look that greatly makes it a very prestigious address to reside in. This residence is a very good choice for any person who will want to enjoy great convenience while at the same time enjoying a luxurious lifestyle.
This is a magnificent 40-story mixed-use residential condominium tower that is nestled at the very heart of the Quezon City in the Cubao area. The development, which is located at the corner of Aurora Boulevard and EDSA is the first to receive a Green Building Certificate from the local authorities and the first to have cantilevered pool at the top floor. This towering development was designed and constructed by one of the Philippines most renowned development and real estate agency, Euro Towers International Corporation. They have a brilliant portfolio that ranges from residential, commercial and industrial buildings with Vivaldi Residences Cubao being their first high-rise development in the real estate rankings. The company has lived up to its billing through creating a very solid and trustable image built on professionalism and high-quality standards in terms of service delivery and their overall project development. Other developments that the company has delivered include the Vivaldi Residences Davao and the Milan Residences Fairview in Quezon City. Vivaldi Residences Cubao is definitely a good mix of great designs both interior and exterior wise which brings out a very glamorous and stylish look that greatly makes it a very prestigious address to reside in. This residence is a very good choice for any person who will want to enjoy great convenience while at the same time enjoying a luxurious lifestyle.
₱ 20,000
Condo · for rent
₱ 26,000
For Rent Furnished Condo at the heart of QC w parking in Sto Cristo, Quezon City
District I Quezon City
· 1 Bedroom · 1 Bath · Condo
· Balcony · Parking · Garden · Security · Swimming pool
District I Quezon City · 1 Bedroom · 1 Bath · Condo · Balcony · Parking · Garden · Security · Swimming pool
For Rent Fully Furnished Condo at the heart of QC with parking in Santo Cristo, Quezon City For lease is a FULLY  FURNISHED CONDO UNIT at Grass Residences, SM North Edsa area, the heart of Quezon City. Find yourself relaxing at a serene spot in this well secured area , with amenities , commercial shops & business centers of SM & Ayala  just a few steps away. Combining business & pleasure in everyday living , yet staying safe in these pandemic times due to easy accessibility to shops, offices & major thoroughfares   is truly unimaginable  yet within reach in this prime spot.  Features include: · 1 BR, with floor area of approx. 30 sqm , with balcony · Furnished with split type aircon, double bed, sofa bed, TV, Ref, washing machine , microwave oven, counter top induction cooker, cabinets & wardrobe , hot & cold shower · 1 parking slot · Lease price: 26 k / month , exclusive of assoc. dues Should you need clarifications or want  to schedule viewing the unit.
For Rent Fully Furnished Condo at the heart of QC with parking in Santo Cristo, Quezon City For lease is a FULLY  FURNISHED CONDO UNIT at Grass Residences, SM North Edsa area, the heart of Quezon City. Find yourself relaxing at a serene spot in this well secured area , with amenities , commercial shops & business centers of SM & Ayala  just a few steps away. Combining business & pleasure in everyday living , yet staying safe in these pandemic times due to easy accessibility to shops, offices & major thoroughfares   is truly unimaginable  yet within reach in this prime spot.  Features include: · 1 BR, with floor area of approx. 30 sqm , with balcony · Furnished with split type aircon, double bed, sofa bed, TV, Ref, washing machine , microwave oven, counter top induction cooker, cabinets & wardrobe , hot & cold shower · 1 parking slot · Lease price: 26 k / month , exclusive of assoc. dues Should you need clarifications or want  to schedule viewing the unit.
₱ 26,000
Condo · for rent
₱ 40,000
Avida Towers Vita Combined Studio Unit for Rent
District I Quezon City
· 1 Bedroom · 2 Baths · Condo
· Air conditioning · Parking · Garden · Gym · Lift · Security · Swimming pool
District I Quezon City · 1 Bedroom · 2 Baths · Condo · Air conditioning · Parking · Garden · Gym · Lift · Security · Swimming pool
Looking for a convenient and accessible home for rent in Quezon City? Look no further than the Avida Vitas Tower! Located in the heart of Quezon City, Avida Towers Vita is a prime condominium development that offers you the best of urban living at an affordable price. With its strategic location, you can easily access all the conveniences of city life, including world-class shopping centers, schools, and transportation hubs. Transportation is a breeze when you live at Avida Towers Vita, with numerous transportation options such as the MRT and LRT just a stone's throw away. Plus, with the project's close proximity to major thoroughfares like EDSA, you can easily get to and from any point in the metro, making commuting a hassle-free experience. Avida Towers Vita is also situated near major commercial establishments such as Ayala Malls Vertis North, Trinoma and SM North EDSA, giving you access to all the conveniences of shopping and dining right at your fingertips. Inside the Avida Towers Vita, you'll find all the amenities you need to live comfortably, including a swimming pool, fully-equipped gym, and 24-hour security. Plus, with a concierge service, you can be sure that you and your family are well taken care of. We have a combined studio unit that measures forty-four square meters, with two bathrooms and one car garage, available for rent. The unit is fully furnished with a full kitchen and dining area, and the space for the bedroom is separated by a beautifully decorated shelf, maximizing the use of space. Renting a unit at Avida Vita Tower is a great option for young professionals, couples, or small families who are looking for a comfortable and convenient living space. Don't miss out on the opportunity to live in an accessible and affordable home for rent at the Avida Towers Vita. Contact us today to schedule a viewing! Floor Area: 44 sqm. Parking: 1 Floor: 10 Condition: Fully Furnished Rate: 40k/month Minimum Lease Term: 2 Years Advance Rental: 2 months Security Deposit: 3 months
Looking for a convenient and accessible home for rent in Quezon City? Look no further than the Avida Vitas Tower! Located in the heart of Quezon City, Avida Towers Vita is a prime condominium development that offers you the best of urban living at an affordable price. With its strategic location, you can easily access all the conveniences of city life, including world-class shopping centers, schools, and transportation hubs. Transportation is a breeze when you live at Avida Towers Vita, with numerous transportation options such as the MRT and LRT just a stone's throw away. Plus, with the project's close proximity to major thoroughfares like EDSA, you can easily get to and from any point in the metro, making commuting a hassle-free experience. Avida Towers Vita is also situated near major commercial establishments such as Ayala Malls Vertis North, Trinoma and SM North EDSA, giving you access to all the conveniences of shopping and dining right at your fingertips. Inside the Avida Towers Vita, you'll find all the amenities you need to live comfortably, including a swimming pool, fully-equipped gym, and 24-hour security. Plus, with a concierge service, you can be sure that you and your family are well taken care of. We have a combined studio unit that measures forty-four square meters, with two bathrooms and one car garage, available for rent. The unit is fully furnished with a full kitchen and dining area, and the space for the bedroom is separated by a beautifully decorated shelf, maximizing the use of space. Renting a unit at Avida Vita Tower is a great option for young professionals, couples, or small families who are looking for a comfortable and convenient living space. Don't miss out on the opportunity to live in an accessible and affordable home for rent at the Avida Towers Vita. Contact us today to schedule a viewing! Floor Area: 44 sqm. Parking: 1 Floor: 10 Condition: Fully Furnished Rate: 40k/month Minimum Lease Term: 2 Years Advance Rental: 2 months Security Deposit: 3 months
₱ 40,000
Condo · for rent
₱ 75,000
Spacious 2 Bedroom Condo for Sale in High Park Tower 2, Vertis North
District I Quezon City
· 88 m² · 2 Bedrooms · 2 Baths · Condo
· 24 hours security · Balcony · Integral kitchen · Built-in wardrobe · Parking · Children area · Lift · Fire alarm · Fire exits · Gym · Security · Swimming pool
District I Quezon City · 88 m² · 2 Bedrooms · 2 Baths · Condo · 24 hours security · Balcony · Integral kitchen · Built-in wardrobe · Parking · Children area · Lift · Fire alarm · Fire exits · Gym · Security · Swimming pool
Key Snapshot - Bedrooms: 2 - Bathrooms: 2 - Floor Area: 88 sqm - Carports: 1 - With maid's quarters and own toilet & bath - Unit Condition: Bare Property Overview Situated on the 46th floor of High Park Tower 2 in Alveo Land’s Vertis North master-planned estate, this 88-square-meter two-bedroom unit offers elevated city views and a versatile layout. As a bare unit, it presents a complete blank canvas for buyers looking to customize their interior finishes, cabinetry, and design layout according to their preferences. The expansive floor area includes dedicated zones for living and dining, an open kitchen space, two full bedrooms, one shared bathroom, 1 master's toilet and bath, and high-floor floor-to-ceiling window openings that maximize natural lighting and ventilation. The unit is paired with one dedicated carport slot within the tower's secure parking facility. Key Features - Interior: Bare unit condition ready for custom fit-out, high floor layout, open living-dining configuration, generous window openings. - Exterior: Covered 1-carport allocation, panoramic high-rise views. - Building / Community: 24/7 security & concierge, infinity pool, fitness center, sky park, alfresco lounge, function rooms, indoor play area, and direct access to Vertis North estate grounds. - Neighborhood & Location Highlights Explore the prime conveniences and lifestyle destinations surrounding this property: Shopping & Retail: - Ayala Malls Vertis North – 3 mins walk (200 m) - Trinoma Mall – 5 mins walk (400 m) - SM City North EDSA – 8 mins walk (700 m) - Landmark Supermarket – 5 mins walk (450 m) Parks & Recreation: - Vertis North Rain Garden Park – 2 mins walk (150 m) - Quezon Memorial Circle – 8 mins drive (2.5 km) Dining & Entertainment: - Seda Vertis North Hotel & Dining – 3 mins walk (250 m) - TriNoma & Vertis Dining Strip – 5 mins walk - Solaire Resort North – 3 mins walk (250 m) Schools & Education: - Philippine Science High School (Main Campus) – 5 mins drive (1.5 km) - University of the Philippines Diliman – 12 mins drive (4.5 km) - Ateneo de Manila University – 15 mins drive (6.0 km) Transit & Accessibility: - Unified Grand Central Station (MRT-3, MRT-7, LRT-1, Metro Manila Subway) – 5 mins walk (500 m) - EDSA & North Avenue Intersections – 3 mins drive (300 m) Schedule a Viewing or Request Details Interested in this property? Contact our dedicated listing team for a straightforward, hassle-free consultation.
Key Snapshot - Bedrooms: 2 - Bathrooms: 2 - Floor Area: 88 sqm - Carports: 1 - With maid's quarters and own toilet & bath - Unit Condition: Bare Property Overview Situated on the 46th floor of High Park Tower 2 in Alveo Land’s Vertis North master-planned estate, this 88-square-meter two-bedroom unit offers elevated city views and a versatile layout. As a bare unit, it presents a complete blank canvas for buyers looking to customize their interior finishes, cabinetry, and design layout according to their preferences. The expansive floor area includes dedicated zones for living and dining, an open kitchen space, two full bedrooms, one shared bathroom, 1 master's toilet and bath, and high-floor floor-to-ceiling window openings that maximize natural lighting and ventilation. The unit is paired with one dedicated carport slot within the tower's secure parking facility. Key Features - Interior: Bare unit condition ready for custom fit-out, high floor layout, open living-dining configuration, generous window openings. - Exterior: Covered 1-carport allocation, panoramic high-rise views. - Building / Community: 24/7 security & concierge, infinity pool, fitness center, sky park, alfresco lounge, function rooms, indoor play area, and direct access to Vertis North estate grounds. - Neighborhood & Location Highlights Explore the prime conveniences and lifestyle destinations surrounding this property: Shopping & Retail: - Ayala Malls Vertis North – 3 mins walk (200 m) - Trinoma Mall – 5 mins walk (400 m) - SM City North EDSA – 8 mins walk (700 m) - Landmark Supermarket – 5 mins walk (450 m) Parks & Recreation: - Vertis North Rain Garden Park – 2 mins walk (150 m) - Quezon Memorial Circle – 8 mins drive (2.5 km) Dining & Entertainment: - Seda Vertis North Hotel & Dining – 3 mins walk (250 m) - TriNoma & Vertis Dining Strip – 5 mins walk - Solaire Resort North – 3 mins walk (250 m) Schools & Education: - Philippine Science High School (Main Campus) – 5 mins drive (1.5 km) - University of the Philippines Diliman – 12 mins drive (4.5 km) - Ateneo de Manila University – 15 mins drive (6.0 km) Transit & Accessibility: - Unified Grand Central Station (MRT-3, MRT-7, LRT-1, Metro Manila Subway) – 5 mins walk (500 m) - EDSA & North Avenue Intersections – 3 mins drive (300 m) Schedule a Viewing or Request Details Interested in this property? Contact our dedicated listing team for a straightforward, hassle-free consultation.
₱ 75,000
Condo · for rent
₱ 15,000
Furnished 1Bedroom for rent in Grass Residences near SM North Edsa
District I Quezon City
· 20 m² · 1 Bedroom · 1 Bath · Condo
· Air conditioning · Parking · Children area · Concierge · Garden · Gym · Lift · Security · Swimming pool
District I Quezon City · 20 m² · 1 Bedroom · 1 Bath · Condo · Air conditioning · Parking · Children area · Concierge · Garden · Gym · Lift · Security · Swimming pool
Furnished 1Bedroom for rent in Grass Residences near SM North Edsa 20sqm Furnished Php 15,000/month 2 months Security Deposit + Post-dated Cheques 1year minimum contract Viewing per schedule call 0923801----
Furnished 1Bedroom for rent in Grass Residences near SM North Edsa 20sqm Furnished Php 15,000/month 2 months Security Deposit + Post-dated Cheques 1year minimum contract Viewing per schedule call 0923801----
₱ 15,000
Condo · for rent
₱ 45,000
Fully Furnished 1Bedroom Condo in High Park Tower 2, Vertis North, Quezon City
District I Quezon City
· 1 Bedroom · 1 Bath · Condo
· Parking · Security · Swimming pool
District I Quezon City · 1 Bedroom · 1 Bath · Condo · Parking · Security · Swimming pool
*For Rent: High Park Tower 2 at Vertis North, Quezon City* - Floor Area: 62 sqm - 1 Bedroom - 1 Bathroom - Fully Furnished: 2 ACs, Shower Heater, 50In Samsung TV, Washer-Dryer, Inverter Ref, E-Stove with oven, Range Hood, Microwave, Philux Sofa, Dining Set, Queen Bed w Mattress *Asking Price: P45,000,000.00 per month* Inclusive of association dues
*For Rent: High Park Tower 2 at Vertis North, Quezon City* - Floor Area: 62 sqm - 1 Bedroom - 1 Bathroom - Fully Furnished: 2 ACs, Shower Heater, 50In Samsung TV, Washer-Dryer, Inverter Ref, E-Stove with oven, Range Hood, Microwave, Philux Sofa, Dining Set, Queen Bed w Mattress *Asking Price: P45,000,000.00 per month* Inclusive of association dues
₱ 45,000
Condo · for rent
₱ 40,000
BRAND-NEW 3BR END UNIT | 83 SQM | 25TH FLOOR | CITY VIEW | NEVER TENANTED | FOR SALE/LEASE Other options:
District I Quezon City
· 83 m² · 3 Bedrooms · 2 Baths · Condo
· Gym · Lift · Security · Swimming pool
District I Quezon City · 83 m² · 3 Bedrooms · 2 Baths · Condo · Gym · Lift · Security · Swimming pool
Be the first to live in this brand-new 83 sqm 3-bedroom end unit at Cameron Residences in Brgy. Mariblo, Roosevelt, Quezon City. Located on the 25th floor, this spacious end unit offers a beautiful city view and the added privacy and natural light that come with an end-unit location. The unit comes with a balcony, perfect for enjoying the view and having a quiet outdoor space at home. ✨ Property Highlights: 83 sqm 3 Bedrooms End Unit 25th Floor With Balcony City View Brand New Never Been Tenanted Available for SALE or LEASE Enjoy the privilege of being the first occupant and make this spacious 3-bedroom residence your own. 📍 CONVENIENT QUEZON CITY LOCATION Cameron Residences is strategically located in Brgy. Mariblo, Roosevelt, with convenient access to Quezon Avenue and Fisher Mall. The location is ideal for families and professionals, with schools, government offices, commercial establishments, restaurants, supermarkets, and public transportation options within easy reach. Its accessibility makes it convenient for daily commuting while keeping essential establishments and services close to home. Whether you are looking for a spacious family residence, a long-term investment, or a premium rental property, this 83 sqm 3-bedroom end unit offers excellent space, privacy, views, and the advantage of being brand new and never occupied. Available for Sale or Lease.
Be the first to live in this brand-new 83 sqm 3-bedroom end unit at Cameron Residences in Brgy. Mariblo, Roosevelt, Quezon City. Located on the 25th floor, this spacious end unit offers a beautiful city view and the added privacy and natural light that come with an end-unit location. The unit comes with a balcony, perfect for enjoying the view and having a quiet outdoor space at home. ✨ Property Highlights: 83 sqm 3 Bedrooms End Unit 25th Floor With Balcony City View Brand New Never Been Tenanted Available for SALE or LEASE Enjoy the privilege of being the first occupant and make this spacious 3-bedroom residence your own. 📍 CONVENIENT QUEZON CITY LOCATION Cameron Residences is strategically located in Brgy. Mariblo, Roosevelt, with convenient access to Quezon Avenue and Fisher Mall. The location is ideal for families and professionals, with schools, government offices, commercial establishments, restaurants, supermarkets, and public transportation options within easy reach. Its accessibility makes it convenient for daily commuting while keeping essential establishments and services close to home. Whether you are looking for a spacious family residence, a long-term investment, or a premium rental property, this 83 sqm 3-bedroom end unit offers excellent space, privacy, views, and the advantage of being brand new and never occupied. Available for Sale or Lease.
₱ 40,000
Condo · for rent
₱ 45,000
LUXURIOUSLY FURNISHED 2BR | 19TH FLOOR | PRIVATE BALCONY | ELEGANT INTERIORS
District I Quezon City
· 53 m² · 2 Bedrooms · 1 Bath · Condo
· 24 hours security · Access for people with disabilities · Air conditioning · Alarm · Balcony · Integral kitchen · Built-in wardrobe · Children area · Concierge · Electricity · Lift · Equipped kitchen · Fire alarm · Fire exits · Garden · Green area · Gym · Laundry room · Multipurpose room · Panoramic view · Security · Smoke detector · Swimming pool · Terrace · Water
District I Quezon City · 53 m² · 2 Bedrooms · 1 Bath · Condo · 24 hours security · Access for people with disabilities · Air conditioning · Alarm · Balcony · Integral kitchen · Built-in wardrobe · Children area · Concierge · Electricity · Lift · Equipped kitchen · Fire alarm · Fire exits · Garden · Green area · Gym · Laundry room · Multipurpose room · Panoramic view · Security · Smoke detector · Swimming pool · Terrace · Water
Step into this beautifully and elegantly interior-designed 53 sqm, 2-bedroom condominium unit featuring a private balcony and a complete set of furniture and appliances. This is a brand-new unit that has never been tenanted, thoughtfully furnished and decorated to provide a comfortable and stylish living experience. Everything you need is already here—just bring yourself and your clothes, and you’re ready to move in! ✨ Property Features: • 53 sqm • 2 Bedrooms • Private balcony • Elegantly interior-designed • Fully furnished • Complete with appliances • Brand-new and never been tenanted • Move-in ready 📌 Lease Terms: • Minimum 1-year lease • 2 months security deposit • 1 month advance • No pets allowed Perfect for those looking for a stylish, comfortable, and hassle-free home without the need to furnish or equip the unit yourself.
Step into this beautifully and elegantly interior-designed 53 sqm, 2-bedroom condominium unit featuring a private balcony and a complete set of furniture and appliances. This is a brand-new unit that has never been tenanted, thoughtfully furnished and decorated to provide a comfortable and stylish living experience. Everything you need is already here—just bring yourself and your clothes, and you’re ready to move in! ✨ Property Features: • 53 sqm • 2 Bedrooms • Private balcony • Elegantly interior-designed • Fully furnished • Complete with appliances • Brand-new and never been tenanted • Move-in ready 📌 Lease Terms: • Minimum 1-year lease • 2 months security deposit • 1 month advance • No pets allowed Perfect for those looking for a stylish, comfortable, and hassle-free home without the need to furnish or equip the unit yourself.
₱ 45,000
Condo · for rent
₱ 35,000
1 bedroom with balcony in High park at vertis north tower 2 condominium for sale Vertis Quezon City
District I Quezon City
· 1 Bedroom · 1 Bath · Condo
· 24 hours security · Air conditioning · Alarm · Balcony · Integral kitchen · Built-in wardrobe · Cctv · Children area · Concierge · Electricity · Lift · Fire alarm · Fire exits · Garden · Green area · Gym · Laundry room · Panoramic view · Security · Smoke detector · Swimming pool · Service room
District I Quezon City · 1 Bedroom · 1 Bath · Condo · 24 hours security · Air conditioning · Alarm · Balcony · Integral kitchen · Built-in wardrobe · Cctv · Children area · Concierge · Electricity · Lift · Fire alarm · Fire exits · Garden · Green area · Gym · Laundry room · Panoramic view · Security · Smoke detector · Swimming pool · Service room
FOR SALE / FOR LEASE | High Park at Vertis North – 1BR City View Premium urban living at High Park at Vertis North by Alveo 🏢 Unit 3116, Tower 2 📐 61 sqm 🛋 Semi-Furnished 💰 Selling Price: PHP 13,420,000 🏠 FOR LEASE: 35,000 semi furnsihed (includes Aircons and water heater) pet friendly 2 deposit 1 advance 📍 Prime Quezon City location, near key landmarks: • Trinoma & SM North EDSA • Vertis North Business District • Quezon Memorial Circle • Nearby schools and hospitals • Close to major transport hubs and office centers ✨ Why this unit is a great choice: • City view unit with panoramic urban scenery • Currently tenanted – ready income stream • Semi-furnished with split-type AC, window AC, and multi-point water heater • Pet-friendly community – ideal for families with pets • Functional layout perfect for professionals or small families • Excellent long-term appreciation potential in a prime urban area A ready income-generating property in a vibrant, highly accessible community—perfect for investors or end-users seeking convenience and modern living. 📩 For more information or to schedule a viewing, contact us today. #ForSale #ForLease #HighParkAtVertisNorth #VertisNorth #Alveo #AlveoLand #QuezonCityProperty #QCCondo #CondoForSale #CondoForLease #PropertyForSale #PropertyForLease #RealEstatePH #PhilippineRealEstate #InvestmentProperty #IncomeGeneratingProperty #RentalProperty #PropertyInvestment #CityView #PetFriendly #SemiFurnished #MetroManilaRealEstate #PropertyLeasing #LeaseProperty #RealEstateListing
FOR SALE / FOR LEASE | High Park at Vertis North – 1BR City View Premium urban living at High Park at Vertis North by Alveo 🏢 Unit 3116, Tower 2 📐 61 sqm 🛋 Semi-Furnished 💰 Selling Price: PHP 13,420,000 🏠 FOR LEASE: 35,000 semi furnsihed (includes Aircons and water heater) pet friendly 2 deposit 1 advance 📍 Prime Quezon City location, near key landmarks: • Trinoma & SM North EDSA • Vertis North Business District • Quezon Memorial Circle • Nearby schools and hospitals • Close to major transport hubs and office centers ✨ Why this unit is a great choice: • City view unit with panoramic urban scenery • Currently tenanted – ready income stream • Semi-furnished with split-type AC, window AC, and multi-point water heater • Pet-friendly community – ideal for families with pets • Functional layout perfect for professionals or small families • Excellent long-term appreciation potential in a prime urban area A ready income-generating property in a vibrant, highly accessible community—perfect for investors or end-users seeking convenience and modern living. 📩 For more information or to schedule a viewing, contact us today. #ForSale #ForLease #HighParkAtVertisNorth #VertisNorth #Alveo #AlveoLand #QuezonCityProperty #QCCondo #CondoForSale #CondoForLease #PropertyForSale #PropertyForLease #RealEstatePH #PhilippineRealEstate #InvestmentProperty #IncomeGeneratingProperty #RentalProperty #PropertyInvestment #CityView #PetFriendly #SemiFurnished #MetroManilaRealEstate #PropertyLeasing #LeaseProperty #RealEstateListing
₱ 35,000
Condo · for rent
₱ 37,000
Brand New 3BR Garden Loft with Parking and Skyline View | The SkySuites Towers QC
District I Quezon City
· 43 m² · 2 Bedrooms · 1 Bath · Condo
· 24 hours security · Access for people with disabilities · Air conditioning · Alarm · Integral kitchen · Parking · Cctv · Concierge · Electricity · Lift · Ensuite · Equipped kitchen · Fire alarm · Fire exits · Garden · Green area · Gym · Internet · Multipurpose room · Panoramic view · Roof garden · Security · Smoke detector · Guardhouse · Swimming pool · Video cable · Water
District I Quezon City · 43 m² · 2 Bedrooms · 1 Bath · Condo · 24 hours security · Access for people with disabilities · Air conditioning · Alarm · Integral kitchen · Parking · Cctv · Concierge · Electricity · Lift · Ensuite · Equipped kitchen · Fire alarm · Fire exits · Garden · Green area · Gym · Internet · Multipurpose room · Panoramic view · Roof garden · Security · Smoke detector · Guardhouse · Swimming pool · Video cable · Water
Brand New 3BR Garden Loft with Parking and Skyline View | The SkySuites Towers QC Available for Sale or Lease. Own or rent this brand new fully furnished 3 Bedroom Garden Loft unit at The SkySuites Towers Quezon City. Located on the 18th floor, this 43 sqm loft-style residence offers panoramic city views, modern interiors, a dedicated parking slot, and immediate occupancy. Designed with a spacious loft layout and high ceilings, this unit provides a bright and comfortable living environment ideal for professionals, couples, families, and investors seeking a premium property in one of Quezon City's most accessible locations. ✨ Unit Details • Brand New Unit • 43 sqm Garden Loft • 3 Bedrooms • 1 Bathroom • Fully Furnished • With Parking Slot • 18th Floor • Panoramic City Skyline View • Ready for Occupancy 🏙️ Unit Features • Modern loft-style design with high ceiling • Spacious living and dining area • Fully furnished interiors • Air-conditioned rooms • Built-in kitchen cabinets • Equipped kitchen • Built-in wardrobes • Balcony • Excellent natural light and ventilation 🏢 Building Amenities • Swimming Pool • Fitness Gym • Roof Garden • Landscaped Garden Areas • Multipurpose Function Room • Concierge Service • High-Speed Elevators • 24/7 Security and CCTV Monitoring 📍 Prime Location • Along Quezon Avenue near EDSA • Near MRT Quezon Avenue Station • Minutes from Trinoma, SM North EDSA, and Vertis North • Near Solaire Resort North • Close to restaurants, cafes, banks, hospitals, schools, and business centers • Convenient access to major roads and public transportation 💰 Selling Price: ₱10,500,000 💰 Rental Rate: ₱37,000 per month ✔ Includes Parking ✔ Fully Furnished ✔ Brand New Condition ✔ Ready for Occupancy A rare opportunity to own or lease a premium 3 Bedroom Garden Loft unit at The SkySuites Towers, offering modern loft living, panoramic city views, premium amenities, and a strategic Quezon City location. For inquiries or viewing appointments, please send a message.
Brand New 3BR Garden Loft with Parking and Skyline View | The SkySuites Towers QC Available for Sale or Lease. Own or rent this brand new fully furnished 3 Bedroom Garden Loft unit at The SkySuites Towers Quezon City. Located on the 18th floor, this 43 sqm loft-style residence offers panoramic city views, modern interiors, a dedicated parking slot, and immediate occupancy. Designed with a spacious loft layout and high ceilings, this unit provides a bright and comfortable living environment ideal for professionals, couples, families, and investors seeking a premium property in one of Quezon City's most accessible locations. ✨ Unit Details • Brand New Unit • 43 sqm Garden Loft • 3 Bedrooms • 1 Bathroom • Fully Furnished • With Parking Slot • 18th Floor • Panoramic City Skyline View • Ready for Occupancy 🏙️ Unit Features • Modern loft-style design with high ceiling • Spacious living and dining area • Fully furnished interiors • Air-conditioned rooms • Built-in kitchen cabinets • Equipped kitchen • Built-in wardrobes • Balcony • Excellent natural light and ventilation 🏢 Building Amenities • Swimming Pool • Fitness Gym • Roof Garden • Landscaped Garden Areas • Multipurpose Function Room • Concierge Service • High-Speed Elevators • 24/7 Security and CCTV Monitoring 📍 Prime Location • Along Quezon Avenue near EDSA • Near MRT Quezon Avenue Station • Minutes from Trinoma, SM North EDSA, and Vertis North • Near Solaire Resort North • Close to restaurants, cafes, banks, hospitals, schools, and business centers • Convenient access to major roads and public transportation 💰 Selling Price: ₱10,500,000 💰 Rental Rate: ₱37,000 per month ✔ Includes Parking ✔ Fully Furnished ✔ Brand New Condition ✔ Ready for Occupancy A rare opportunity to own or lease a premium 3 Bedroom Garden Loft unit at The SkySuites Towers, offering modern loft living, panoramic city views, premium amenities, and a strategic Quezon City location. For inquiries or viewing appointments, please send a message.
₱ 37,000
Studio · for rent
₱ 15,000
Studio for Rent in Victoria De Morato
District I Quezon City
· 23 m² · 1 Bath · Studio
· Children area · Gym · Security
District I Quezon City · 23 m² · 1 Bath · Studio · Children area · Gym · Security
for rent semi furnished
for rent semi furnished
₱ 15,000
Condo · for rent
₱ 70,000
2 Two Bedroom For Rent Vertis North High Park Tower 2 Bagong Pag asa Quezon City
District I Quezon City
· 80 m² · 2 Bedrooms · 2 Baths · Condo
· 24 hours security · Air conditioning · Parking · Concierge · Lift · Fire exits · Gym · Security
District I Quezon City · 80 m² · 2 Bedrooms · 2 Baths · Condo · 24 hours security · Air conditioning · Parking · Concierge · Lift · Fire exits · Gym · Security
For Rent Vertis North HIGH PARK TOWER 2 By Alveo Bagong Pag asa Quezon City 2 bedrooms and 2 toilet and bath Floor area 80sqm Semi furnished with Air conditioner only corner unit with 1 parking slot Price : 70k per month including dues
For Rent Vertis North HIGH PARK TOWER 2 By Alveo Bagong Pag asa Quezon City 2 bedrooms and 2 toilet and bath Floor area 80sqm Semi furnished with Air conditioner only corner unit with 1 parking slot Price : 70k per month including dues
₱ 70,000
Studio · for rent
₱ 30,000
High Park Towers Studio FOR RENT or SALE
District I Quezon City
· 32 m² · 1 Bath · Studio
· Air conditioning · Alarm · Built-in wardrobe · Parking · Cctv · Children area · Concierge · Fire exits · Garden · Green area · Gym · Lift · Multipurpose room · Smoke detector · Swimming pool · 24 hours security · Patio
District I Quezon City · 32 m² · 1 Bath · Studio · Air conditioning · Alarm · Built-in wardrobe · Parking · Cctv · Children area · Concierge · Fire exits · Garden · Green area · Gym · Lift · Multipurpose room · Smoke detector · Swimming pool · 24 hours security · Patio
Tastefully furnished wood-themed large studio-type condo unit set in Ayala Premier’s serene & green mixed use township development, Vertis North Estate.  3 major malls within walking distance:  Vertis Mall, Trinoma, & connected via covered walkway SM City North.  High Park residents can avail of shuttle bus services from the condo to & from Vertis Mall & Trinoma every 20-30 minutes daily from 6AM to 9PM.  Vertis is bounded by EDSA north bound lane, North Ave., Agham Road (now Sen. Miriam Defensor-Santiago  Ave., & Quezon Ave. For Sale: Immediately For Lease : Availability from Oct 8, 2027 onwards
Tastefully furnished wood-themed large studio-type condo unit set in Ayala Premier’s serene & green mixed use township development, Vertis North Estate.  3 major malls within walking distance:  Vertis Mall, Trinoma, & connected via covered walkway SM City North.  High Park residents can avail of shuttle bus services from the condo to & from Vertis Mall & Trinoma every 20-30 minutes daily from 6AM to 9PM.  Vertis is bounded by EDSA north bound lane, North Ave., Agham Road (now Sen. Miriam Defensor-Santiago  Ave., & Quezon Ave. For Sale: Immediately For Lease : Availability from Oct 8, 2027 onwards
₱ 30,000
Condo · for rent
₱ 75,000
For Rent: 2-BR Condominium Unit at High Park Tower 2 Vertis North, Quezon City
District I Quezon City
· 87 m² · 2 Bedrooms · 3 Baths · Condo
· Fire exits · Lift · 24 hours security
District I Quezon City · 87 m² · 2 Bedrooms · 3 Baths · Condo · Fire exits · Lift · 24 hours security
High Park Tower 2  2-Bedroom  87 sqm  41st Floor With maid's room  Additional 5K for parking
High Park Tower 2  2-Bedroom  87 sqm  41st Floor With maid's room  Additional 5K for parking
₱ 75,000
Condo · for rent
₱ 16,000
New
Exclusive: Fully Furnished 1 Bedroom unit in Grass Residences QC near SM North and Trinoma
District I Quezon City
· 23 m² · 1 Bedroom · 1 Bath · Condo
· Air conditioning · Parking · Children area · Concierge · Garden · Gym · Lift · Security · Swimming pool
District I Quezon City · 23 m² · 1 Bedroom · 1 Bath · Condo · Air conditioning · Parking · Children area · Concierge · Garden · Gym · Lift · Security · Swimming pool
Details: - 1 Bedroom, 1 Toilet & Bath - Floor Area: 23.04sqm - Located on the 33th floor of Tower 1-B - Fully Furnished - No Parking Sale Price: Php3,500,000.00 Rental Price: Php16,000.00 Fully Furnished includes: Bed, Refrigerator, TV, Sofa bed, Dining Set, Cabinets, Aircon Amenities: * Swimming pools * Gym * Badminton court * Basketball court * Playground * Jogging paths Near Malls like SM North, Trinoma Near Schools like Quezon City Academy, San Francisco School Near MRT, Bago Bantay, West Avenue, EDSA, Munoz Accessible to commercial area
Details: - 1 Bedroom, 1 Toilet & Bath - Floor Area: 23.04sqm - Located on the 33th floor of Tower 1-B - Fully Furnished - No Parking Sale Price: Php3,500,000.00 Rental Price: Php16,000.00 Fully Furnished includes: Bed, Refrigerator, TV, Sofa bed, Dining Set, Cabinets, Aircon Amenities: * Swimming pools * Gym * Badminton court * Basketball court * Playground * Jogging paths Near Malls like SM North, Trinoma Near Schools like Quezon City Academy, San Francisco School Near MRT, Bago Bantay, West Avenue, EDSA, Munoz Accessible to commercial area
₱ 16,000
Condo · for rent
₱ 29,000
2BR CAMERON RESIDENCES | BARE | with balcony | lower floor | Quezon Ave | Fisher mall | near UST | Quezon City | DMCI homes | For rent| BRAND NEW
District I Quezon City
· 2 Bedrooms · Condo
· Gym · Lift · Security · Swimming pool · 24 hours security · Alarm · Air conditioning · Balcony · Cellar · Built-in wardrobe · Cctv · Parking · Concierge · Children area · Laundry room · Access for people with disabilities · Fire alarm · Equipped kitchen · Electricity · Fire exits · Garden · Green area · Grill · Guardhouse · Heating · Integral kitchen · Library · Internet · Multipurpose room · Natural gas · Panoramic view · Roof garden · Office room · Service room · Tennis court · Smoke detector · Terrace · Water · Water tank · Patio · Wifi · Video cable
District I Quezon City · 2 Bedrooms · Condo · Gym · Lift · Security · Swimming pool · 24 hours security · Alarm · Air conditioning · Balcony · Cellar · Built-in wardrobe · Cctv · Parking · Concierge · Children area · Laundry room · Access for people with disabilities · Fire alarm · Equipped kitchen · Electricity · Fire exits · Garden · Green area · Grill · Guardhouse · Heating · Integral kitchen · Library · Internet · Multipurpose room · Natural gas · Panoramic view · Roof garden · Office room · Service room · Tennis court · Smoke detector · Terrace · Water · Water tank · Patio · Wifi · Video cable
FOR RENT ❗ DMCI CAMERON RESIDENCES LOC: QUEZON AVE, QC near fishermall and UST -2 bedroom -with balcony -bare -lower floor Rental rate: 29k inclusive of assoc dues
FOR RENT ❗ DMCI CAMERON RESIDENCES LOC: QUEZON AVE, QC near fishermall and UST -2 bedroom -with balcony -bare -lower floor Rental rate: 29k inclusive of assoc dues
₱ 29,000
Condo · for rent
₱ 35,000
2 Bedroom Furnished Unit in Cameron Residences
District I Quezon City
· 53 m² · 2 Bedrooms · 1 Bath · Condo
· Gym · Lift · Security · Swimming pool
District I Quezon City · 53 m² · 2 Bedrooms · 1 Bath · Condo · Gym · Lift · Security · Swimming pool
𝐅𝐎𝐑 𝐋𝐄𝐀𝐒𝐄 | 𝐂𝐚𝐦𝐞𝐫𝐨𝐧 𝐑𝐞𝐬𝐢𝐝𝐞𝐧𝐜𝐞𝐬 𝐛𝐲 𝐃𝐌𝐂𝐈 𝐏𝐡𝐩 𝟑𝟓,𝟎𝟎𝟎 𝟐 𝐁𝐞𝐝𝐫𝐨𝐨𝐦 𝐅𝐮𝐥𝐥𝐲 𝐅𝐮𝐫𝐧𝐢𝐬𝐡𝐞𝐝 𝐔𝐧𝐢𝐭 Loc: Mapalad St. Brgy. Mariblo, Roosevelt Ave. Quezon City - 2 Bedroom Furnished Unit - 1 Balcony - 40th Floor - 53sqm - NO Parking Availability: ASAP Assoc Dues: Already included in Rental Fee Length of lease: Minimum of 1 year Required payment: 2 months advance + 2 months deposit + PDCs 𝐍𝐎 𝐀𝐠𝐞𝐧𝐭𝐬. 𝐃𝐢𝐫𝐞𝐜𝐭 𝐜𝐥𝐢𝐞𝐧𝐭𝐬 𝐨𝐧𝐥𝐲. Message me for more details JR | 0917-133---- (Viber/SMS/WhatsApp)
𝐅𝐎𝐑 𝐋𝐄𝐀𝐒𝐄 | 𝐂𝐚𝐦𝐞𝐫𝐨𝐧 𝐑𝐞𝐬𝐢𝐝𝐞𝐧𝐜𝐞𝐬 𝐛𝐲 𝐃𝐌𝐂𝐈 𝐏𝐡𝐩 𝟑𝟓,𝟎𝟎𝟎 𝟐 𝐁𝐞𝐝𝐫𝐨𝐨𝐦 𝐅𝐮𝐥𝐥𝐲 𝐅𝐮𝐫𝐧𝐢𝐬𝐡𝐞𝐝 𝐔𝐧𝐢𝐭 Loc: Mapalad St. Brgy. Mariblo, Roosevelt Ave. Quezon City - 2 Bedroom Furnished Unit - 1 Balcony - 40th Floor - 53sqm - NO Parking Availability: ASAP Assoc Dues: Already included in Rental Fee Length of lease: Minimum of 1 year Required payment: 2 months advance + 2 months deposit + PDCs 𝐍𝐎 𝐀𝐠𝐞𝐧𝐭𝐬. 𝐃𝐢𝐫𝐞𝐜𝐭 𝐜𝐥𝐢𝐞𝐧𝐭𝐬 𝐨𝐧𝐥𝐲. Message me for more details JR | 0917-133---- (Viber/SMS/WhatsApp)
₱ 35,000
Condo · for rent
₱ 28,000
Cameron Residences 1BR Fully Furnished For Rent in Quezon City near Fishermall
District I Quezon City
· 1 Bedroom · 1 Bath · Condo
· Gym · Lift · Security · Swimming pool · Alarm · Balcony · Air conditioning · 24 hours security · Electricity · Fire alarm · Fire exits · Smoke detector · Service room · Roof garden · Terrace · Water tank · Water
District I Quezon City · 1 Bedroom · 1 Bath · Condo · Gym · Lift · Security · Swimming pool · Alarm · Balcony · Air conditioning · 24 hours security · Electricity · Fire alarm · Fire exits · Smoke detector · Service room · Roof garden · Terrace · Water tank · Water
Cameron Residences 1BR Fully Furnished For Rent in Quezon City near Fishermall‼️‼️‼️ ▪️33sqm ▪️Lower floor ▪️Facing amenities ▪️Inclusive of association dues ▪️Fully furnished ▪️Minimum 1 year lease ▪️2+1 ✨28k/month (slightly negotiable) Listing Code: DLCAR1BRPR
Cameron Residences 1BR Fully Furnished For Rent in Quezon City near Fishermall‼️‼️‼️ ▪️33sqm ▪️Lower floor ▪️Facing amenities ▪️Inclusive of association dues ▪️Fully furnished ▪️Minimum 1 year lease ▪️2+1 ✨28k/month (slightly negotiable) Listing Code: DLCAR1BRPR
₱ 28,000
Condo · for rent
₱ 30,000
Cameron Residences 2BR Semi Furnished For Rent near Fishermall‼️‼️
District I Quezon City
· 2 Bedrooms · 1 Bath · Condo
· Gym · Lift · Security · Swimming pool · Balcony · Alarm · 24 hours security · Air conditioning · Laundry room · Concierge · Electricity · Fire alarm · Fire exits · Garden · Roof garden · Service room · Smoke detector · Terrace · Water · Water tank
District I Quezon City · 2 Bedrooms · 1 Bath · Condo · Gym · Lift · Security · Swimming pool · Balcony · Alarm · 24 hours security · Air conditioning · Laundry room · Concierge · Electricity · Fire alarm · Fire exits · Garden · Roof garden · Service room · Smoke detector · Terrace · Water · Water tank
Cameron Residences 2BR Semi Furnished For Rent near Fishermall‼️‼️‼️ ▪️2 bedroom ▪️66sqm ▪️17th floor ▪️semi furnished - 1 split type AC - 2 window type AC - rangehood - induction cooktop ✨30k ONLY‼️ Available for viewing on Saturday 11am onwards.
Cameron Residences 2BR Semi Furnished For Rent near Fishermall‼️‼️‼️ ▪️2 bedroom ▪️66sqm ▪️17th floor ▪️semi furnished - 1 split type AC - 2 window type AC - rangehood - induction cooktop ✨30k ONLY‼️ Available for viewing on Saturday 11am onwards.
₱ 30,000
Studio · for rent
₱ 15,000
FOR RENT - PINECREST AURORA BLVD QUEZON CITY - 15,000 / MONTH
District I Quezon City
· 25 m² · 1 Bath · Studio
· Security · Swimming pool · 24 hours security · Gym
District I Quezon City · 25 m² · 1 Bath · Studio · Security · Swimming pool · 24 hours security · Gym
A fully furnished studio unit; located in a quiet and gated 2-building set up with entrance, and complete amenities, and an outdoor pool and 24/7 security and convenience store on the ground floor beside the gate; located just beside the first-class Robinson Magnolia mall and a few steps to Gilmore LRT (Light Rail Transit) station, a few minutes drive to St Lukes Medical Center QC, St.
A fully furnished studio unit; located in a quiet and gated 2-building set up with entrance, and complete amenities, and an outdoor pool and 24/7 security and convenience store on the ground floor beside the gate; located just beside the first-class Robinson Magnolia mall and a few steps to Gilmore LRT (Light Rail Transit) station, a few minutes drive to St Lukes Medical Center QC, St.
₱ 15,000
Townhouse · for rent
₱ 40,000
FIRE LEASE AND SALE IN KUNDIMAN QC
District I Quezon City
· 4 Bedrooms · 3 Baths · Townhouse
District I Quezon City · 4 Bedrooms · 3 Baths · Townhouse
Located in a quiet, exclusive cul-de-sac in Kundiman, Quezon City, this Premium First Unit offers everything a growing family needs. Because it sits at the prime corner with an open rear waterway easement, you get zero back-to-back neighbors. That means continuous, unobstructed cross-ventilation and brilliant natural light flowing straight into your home all day long. 🏡 Property Highlights: 4 Spacious Bedrooms & 3 Bathrooms: Perfectly laid out for family living. The "First Unit" Advantage: Effortless parking and maximum street frontage. Cul-de-Sac Exclusivity: Zero passing traffic. Let your kids ride their bikes safely right outside your door. Open Rear Easement: Enjoy extra privacy and breezy interiors without staring into a neighbor's window. (If true, add: 💯 100% Flood-Free elevation with solid reinforced retaining walls for total peace of mind.) This is a rare layout in QC and units with this much natural airflow go fast.
Located in a quiet, exclusive cul-de-sac in Kundiman, Quezon City, this Premium First Unit offers everything a growing family needs. Because it sits at the prime corner with an open rear waterway easement, you get zero back-to-back neighbors. That means continuous, unobstructed cross-ventilation and brilliant natural light flowing straight into your home all day long. 🏡 Property Highlights: 4 Spacious Bedrooms & 3 Bathrooms: Perfectly laid out for family living. The "First Unit" Advantage: Effortless parking and maximum street frontage. Cul-de-Sac Exclusivity: Zero passing traffic. Let your kids ride their bikes safely right outside your door. Open Rear Easement: Enjoy extra privacy and breezy interiors without staring into a neighbor's window. (If true, add: 💯 100% Flood-Free elevation with solid reinforced retaining walls for total peace of mind.) This is a rare layout in QC and units with this much natural airflow go fast.
₱ 40,000
Condo · for rent
₱ 45,000
3bedroom w/ aircon 2 balconies QUEZON CITY DMCI CAMERON w/ parking additional 8k
District I Quezon City
· 83 m² · 3 Bedrooms · 2 Baths · Condo
· Gym · Lift · Security · Swimming pool · 24 hours security · Air conditioning · Alarm · Balcony · Parking · Cctv · Children area · Laundry room · Concierge · Access for people with disabilities · Fire exits · Garden · Green area · Grill · Water · Wifi · Patio
District I Quezon City · 83 m² · 3 Bedrooms · 2 Baths · Condo · Gym · Lift · Security · Swimming pool · 24 hours security · Air conditioning · Alarm · Balcony · Parking · Cctv · Children area · Laundry room · Concierge · Access for people with disabilities · Fire exits · Garden · Green area · Grill · Water · Wifi · Patio
Cameron Residences -near Fisher Mall 3bedroom 2balconies 2toilet &bath All room have AC W/ living room AC 83sqm Facing east/ morning sun 45k unit only 8k for parking Inclusive ASD 2months deposit 1month advance Min. 1 year contract PDC required Under PRC Lic. 0001658
Cameron Residences -near Fisher Mall 3bedroom 2balconies 2toilet &bath All room have AC W/ living room AC 83sqm Facing east/ morning sun 45k unit only 8k for parking Inclusive ASD 2months deposit 1month advance Min. 1 year contract PDC required Under PRC Lic. 0001658
₱ 45,000
Condo · for rent
₱ 100,000
Updated
🏙️ FOR RENT | ₱100,000/MONTH – SPACIOUS 2BR CONDO | 88 SQM | HIGH PARK AT VERTIS NORTH, QUEZON CITY ✨
District I Quezon City
· 88 m² · 2 Bedrooms · 2 Baths · Condo
· Parking · Security · Swimming pool
District I Quezon City · 88 m² · 2 Bedrooms · 2 Baths · Condo · Parking · Security · Swimming pool
🏙️ FOR RENT | HIGH PARK AT VERTIS NORTH – QUEZON CITY ✨ SPACIOUS 2-BEDROOM CONDO | 88 SQM | ₱100,000/MONTH Experience modern city living at High Park at Vertis North, a premium residential address in one of Quezon City's most dynamic lifestyle and business districts. Perfect for professionals, couples, families, or executives seeking a spacious home with convenient access to shopping, dining, business hubs, and transportation. 🏡 PROPERTY DETAILS 📍 Location: High Park at Vertis North, Quezon City 🛏️ Bedrooms: 2 📐 Floor Area: 88 sqm 💰 Monthly Rental: ₱100,000 🌟 ENJOY THE CONVENIENCE OF VERTIS NORTH ✔️ Close to Ayala Malls Vertis North ✔️ Near TriNoma and SM North EDSA ✔️ Convenient access to MRT-3 North Avenue Station ✔️ Accessible to major roads, offices, restaurants, and commercial establishments ✔️ Ideal location for urban professionals and families ✨ Your next spacious city home awaits! 📩 Interested? Send us a message for unit photos, furnishing details, lease terms, and viewing arrangements. #ForRent #HighParkAtVertisNorth #VertisNorth #QuezonCityCondo #2BedroomCondo #CondoForRent #PremiumLiving
🏙️ FOR RENT | HIGH PARK AT VERTIS NORTH – QUEZON CITY ✨ SPACIOUS 2-BEDROOM CONDO | 88 SQM | ₱100,000/MONTH Experience modern city living at High Park at Vertis North, a premium residential address in one of Quezon City's most dynamic lifestyle and business districts. Perfect for professionals, couples, families, or executives seeking a spacious home with convenient access to shopping, dining, business hubs, and transportation. 🏡 PROPERTY DETAILS 📍 Location: High Park at Vertis North, Quezon City 🛏️ Bedrooms: 2 📐 Floor Area: 88 sqm 💰 Monthly Rental: ₱100,000 🌟 ENJOY THE CONVENIENCE OF VERTIS NORTH ✔️ Close to Ayala Malls Vertis North ✔️ Near TriNoma and SM North EDSA ✔️ Convenient access to MRT-3 North Avenue Station ✔️ Accessible to major roads, offices, restaurants, and commercial establishments ✔️ Ideal location for urban professionals and families ✨ Your next spacious city home awaits! 📩 Interested? Send us a message for unit photos, furnishing details, lease terms, and viewing arrangements. #ForRent #HighParkAtVertisNorth #VertisNorth #QuezonCityCondo #2BedroomCondo #CondoForRent #PremiumLiving
₱ 100,000
Condo · for rent
₱ 45,000
3bedroom w/ AC in QC W/ parking 8k 3br Cameron residences DMCI
District I Quezon City
· 83 m² · 3 Bedrooms · 2 Baths · Condo
· Gym · Lift · Security · Swimming pool · Wifi · Water · Roof garden · Internet · Fire exits · 24 hours security · Air conditioning · Alarm · Balcony · Parking · Cctv · Children area · Laundry room · Concierge · Access for people with disabilities · Electricity · Equipped kitchen · Fire alarm · Garden · Green area · Grill · Guardhouse · Multipurpose room · Panoramic view
District I Quezon City · 83 m² · 3 Bedrooms · 2 Baths · Condo · Gym · Lift · Security · Swimming pool · Wifi · Water · Roof garden · Internet · Fire exits · 24 hours security · Air conditioning · Alarm · Balcony · Parking · Cctv · Children area · Laundry room · Concierge · Access for people with disabilities · Electricity · Equipped kitchen · Fire alarm · Garden · Green area · Grill · Guardhouse · Multipurpose room · Panoramic view
Cameron Residences -near Fisher Mall 3bedroom 2balconies All room have AC W/ living room AC 83sqm Facing east/ morning sun 45k unit only 8k for parking Inclusive ASD 2months deposit 1month advance Min. 1 year contract PDC required Under PRC Lic. 0001658
Cameron Residences -near Fisher Mall 3bedroom 2balconies All room have AC W/ living room AC 83sqm Facing east/ morning sun 45k unit only 8k for parking Inclusive ASD 2months deposit 1month advance Min. 1 year contract PDC required Under PRC Lic. 0001658
₱ 45,000

Get email alerts

Don't miss out: be the first to know about new properties

The alert was correctly created

On subscribing you accept the conditions of use and the privacy policy
Alert
Receive new ads in your inbox
Save this search
Receive alerts for new listings

We'll send you an email when we have new properties for: "Properties to rent in District I Quezon City"

The alert was correctly created

Kamuning MRT
North Avenue MRT
Get email alerts and be the first to see new listings
Required field
On subscribing I accept the terms of the privacy policy
Perfect! You'll soon start receiving new listings via email
Alert
Receive an email when we have new ads for Properties to rent in District I Quezon City
Save this search
Filters

Bedrooms

Size (m²)

m²
m²

Price (₱ per month)

₱
₱

Bathrooms

Clear all filters
Receive notifications when new entries are published.